Sam McCoy Manufacturing · Shah Alam · Since 1983

We move water.

Spillway gates that hold rivers. Screw pumps that lift them. Screens, conveyors and dewatering that clean up what's left — engineered, fabricated and serviced in Shah Alam for rivers, treatment plants and mills across Southeast Asia.

3.0259° N · 101.5579° EScrollModel shown at 30° · not to scale with site
0+years of engineering, since 1983
0+successful projects across Southeast Asia
0Obermeyer gate installations in ASEAN since 2006
0of those gates operating for over 10 years

Follow the water

Six machines between a river and a clean discharge.

Water moves through a system, and so does our work. Scroll the line from the river gate to the service bay — each stage is something we design, fabricate, install and keep running.

Obermeyer spillway gates
01 · HOLD
Screening systems
02 · SCREEN
Archimedean screw pumps
03 · LIFT
Shaftless screw conveyors
04 · CONVEY
Sludge dewatering
05 · DEWATER
After-market service
06 · SUSTAIN
Obermeyer spillway gates

STAGE 01 — HOLD

Obermeyer spillway gates

Steel gate panels held up by inflatable air bladders. Change the air pressure and the crest moves — so a river keeps a steady level in the dry season and passes a flood in the wet.

  • 44installations in ASEAN since 2006
  • 3.5 mSungai Selangor gate, 2024
  • 0litres of hydraulic oil
Explore obermeyer spillway gates →
Screening systems

STAGE 02 — SCREEN

Screening systems

Back-rake, chain-rake, wire-rope, trash-rake and rotary screens strip out the solids and debris a river or sewer carries — before they reach pumps, valves and treatment.

  • 5screen families
  • 600–2,000mm channel widths (BRB)
  • 12–25mm slot width
Explore screening systems →
Archimedean screw pumps

STAGE 03 — LIFT

Archimedean screw pumps

An open screw turning in a trough. No collection sump, minimal inlet head, and gentle handling of biological floc — the oldest pump design, engineered for modern plants.

  • 1,050l/s per screw at Parit Merbau
  • Ø 2.15 mby 11.6 m screws
  • 215 kWdrive at Bayan Baru
Explore archimedean screw pumps →
Shaftless screw conveyors

STAGE 04 — CONVEY

Shaftless screw conveyors

A cold-formed spiral with no centre shaft and no intermediate bearings — so wet pulp, screenings and sticky sludge move in a fully enclosed, quiet, odour-free trough.

  • 20 msingle units, push or pull
  • 80m³/h max (SC 580, level)
  • 30°max incline
Explore shaftless screw conveyors →
Sludge dewatering

STAGE 05 — DEWATER

Sludge dewatering

Dewatering zones, screw presses and washers that pull the water back out of screenings and sludge — less volume to haul, less to dispose of.

  • 75%volume reduction possible (SCD)
  • 2019–21Semarang treatment plant
  • 5SCD sizes
Explore sludge dewatering →
After-market service

STAGE 06 — SUSTAIN

After-market service

Scheduled maintenance and inspections, spare parts and system upgrades, and rapid-response technical support — from the people who built it.

  • 40+years of engineering
  • ISO 9001:2015 · DNV
  • 1team from design to service
Explore after-market service →

Gate Lab · interactive

Two forces. One steady river.

An Obermeyer gate is a steel panel resting on an air bladder. The river pushes it down; the bladder pushes it up. Set the inflow, pick a real site from our register, and watch the gate find its level — or lie flat to let a flood through.

HOLDING LEVEL
Upstream level—
Crest height—
Gate angle—
Overflow head—
Discharge—
Bladder pressure—
River inflow —
Control mode
  • Infinitely adjustable. Any crest height from fully lowered to fully raised.
  • No hydraulic oil. Air does the work — nothing toxic near the river.
  • Debris passes over. Watch the logs ride the nappe when the gate drops.

Simulation for illustration. Discharge uses a standard weir relation (Q = C·L·H1.5, C ≈ 1.8); pressures are relative. Real gates are designed by Obermeyer Hydro and sized per site.

Built in Shah Alam

An American gate. A Malaysian backbone.

Sam McCoy (1983) and Obermeyer Hydro (1988) work as partners. The rubber is made in Colorado; the steel, the controls and the people on site are ours.

Obermeyer Hydro · USA

  • Gate design and performance guarantee
  • Manufacture of all rubber components — air bladders and hinges — at Fort Collins, Colorado

Sam McCoy · Malaysia

  • Manufacture of steel components — gate panels, clamps, abutment plates
  • Supply of control panels
  • Installation and service
  • Marketing across the region
Sam McCoy headquarters, Section 26 Shah Alam
HQ · Section 26, Shah Alam
Gate panels being installed at Sungai Langat
Panel install · Sg Langat
Lowered gate panels showing the air bladder, Sungai Selangor
Bladder & panels · Sg Selangor

Project file

Proof, poured in concrete.

Parit Merbau — Archimedean screw pumpsPRJ·01

Archimedean screw pumps

Parit Merbau

Selangor, Malaysia

  • Units3 × ASP
  • Flow1,050 l/s each
  • ScrewØ 2,150 × 11,600 mm
Bayan Baru — Archimedean screw pumpsPRJ·02

Archimedean screw pumps

Bayan Baru

Penang, Malaysia

  • Motor215 kW · 415 V Siemens
  • DriveFlender gearbox
Langat Wastewater Treatment Plant — Archimedean screw pumpsPRJ·03

Archimedean screw pumps

Langat Wastewater Treatment Plant

Selangor, Malaysia

  • DutyInlet works lift
  • LiftsRaw sewage to primary screening
Sungai Selangor — Obermeyer spillway gatePRJ·04

Obermeyer spillway gate

Sungai Selangor

Selangor, Malaysia

  • Gate3.5 m H × 48 m L
  • Year2024
Sungai Langat — Obermeyer spillway gatePRJ·05

Obermeyer spillway gate

Sungai Langat

Selangor, Malaysia

  • Gate1.6 m H × 25 m W
  • Year2014
Tirtonadi, Solo — Obermeyer spillway gatePRJ·06

Obermeyer spillway gate

Tirtonadi, Solo

Central Java, Indonesia

  • Gate3.08 m H × 60 m W
  • Year2017
Semarang — Obermeyer spillway gatePRJ·07

Obermeyer spillway gate

Semarang

Central Java, Indonesia

  • Gate2.5 m H × 152 m L
  • Year2018
Semarang City Treatment Plant — Sludge dewateringPRJ·08

Sludge dewatering

Semarang City Treatment Plant

Central Java, Indonesia

  • StartNov 2019
  • EndNov 2021
Sungai Bealat — Screening systemsPRJ·09

Screening systems

Sungai Bealat

Kuantan, Pahang

  • ScopeMechanical screens
Utrecht — Shaftless screw conveyorsPRJ·10

Shaftless screw conveyors

Utrecht

The Netherlands

  • TypeRadial conveyor
  • LoadScreenings & sludge
Nanming River — Obermeyer spillway gatePRJ·11

Obermeyer spillway gate

Nanming River

China

  • Gate8 m H × 60 m W
  • Sites4

Regional reach

From Sabah to Central Java, one register.

Every pin is a gate we supplied or a project we delivered — from Babagon Dam in 2006 to the Selangor River in 2024. Tap a pin for its numbers.

Select a pin

44 installations

across ASEAN since 2006 · 16 operating for over a decade

See the full gate register →
SHAH ALAM HQ

Pin positions are approximate (river or town level).

After-market

Built once. Kept turning for decades.

Our commitment goes beyond delivery. Raise a service ticket here — it drafts an email to our engineers with everything they need to respond.

  • Scheduled maintenance and inspections
  • Spare parts and system upgrades
  • Rapid-response technical support
Service console SMC-SRV-0000
01 · Equipment
02 · Request
03 · Site

Newsroom

On the record.

News, events & CSR →
ISO 9001:2015 & DNV certification renewed

May 2025 · Quality

ISO 9001:2015 & DNV certification renewed

Sam McCoy renewed its ISO 9001:2015 certification and DNV accreditation — confirming a quality management system built for efficiency, customer satisfaction and continuous improvement.

Smart water solutions at MIWC 2019

2019 · Event

Smart water solutions at MIWC 2019

Showcasing water-control and treatment engineering at the Malaysia International Water Convention.

New products and partnerships at ASIAWATER 2018

2018 · Event

New products and partnerships at ASIAWATER 2018

Introducing products and strategic partnerships at Southeast Asia's water industry show in Kuala Lumpur.

Engineering for the palm oil industry

PALMEX · Event

Engineering for the palm oil industry

Meeting mill engineers at PALMEX with equipment built for the palm oil sector.

Next project

Have a river to hold, or a plant to upgrade?

Tell us the site, the flow and the problem. Our engineers will come back with an assessment and a way forward.