Projects

Rivers held. Plants running.

A selection of the 100+ projects we have delivered across Southeast Asia — with the numbers that matter to engineers.

11 projects

Parit Merbau — Archimedean screw pumpsPRJ·01

Archimedean screw pumps

Parit Merbau

Selangor, Malaysia

  • Units3 × ASP
  • Flow1,050 l/s each
  • ScrewØ 2,150 × 11,600 mm
Bayan Baru — Archimedean screw pumpsPRJ·02

Archimedean screw pumps

Bayan Baru

Penang, Malaysia

  • Motor215 kW · 415 V Siemens
  • DriveFlender gearbox
Langat Wastewater Treatment Plant — Archimedean screw pumpsPRJ·03

Archimedean screw pumps

Langat Wastewater Treatment Plant

Selangor, Malaysia

  • DutyInlet works lift
  • LiftsRaw sewage to primary screening
Sungai Selangor — Obermeyer spillway gatePRJ·04

Obermeyer spillway gate

Sungai Selangor

Selangor, Malaysia

  • Gate3.5 m H × 48 m L
  • Year2024
Sungai Langat — Obermeyer spillway gatePRJ·05

Obermeyer spillway gate

Sungai Langat

Selangor, Malaysia

  • Gate1.6 m H × 25 m W
  • Year2014
Tirtonadi, Solo — Obermeyer spillway gatePRJ·06

Obermeyer spillway gate

Tirtonadi, Solo

Central Java, Indonesia

  • Gate3.08 m H × 60 m W
  • Year2017
Semarang — Obermeyer spillway gatePRJ·07

Obermeyer spillway gate

Semarang

Central Java, Indonesia

  • Gate2.5 m H × 152 m L
  • Year2018
Semarang City Treatment Plant — Sludge dewateringPRJ·08

Sludge dewatering

Semarang City Treatment Plant

Central Java, Indonesia

  • StartNov 2019
  • EndNov 2021
Sungai Bealat — Screening systemsPRJ·09

Screening systems

Sungai Bealat

Kuantan, Pahang

  • ScopeMechanical screens
Utrecht — Shaftless screw conveyorsPRJ·10

Shaftless screw conveyors

Utrecht

The Netherlands

  • TypeRadial conveyor
  • LoadScreenings & sludge
Nanming River — Obermeyer spillway gatePRJ·11

Obermeyer spillway gate

Nanming River

China

  • Gate8 m H × 60 m W
  • Sites4

Regional reach

44 gate installations. One team.

Obermeyer spillway gates supplied by Sam McCoy since 2006, plus selected pump, screen and conveyor projects.

Select a pin

Since 2006

Malaysia · Indonesia · Thailand

SHAH ALAM HQ

Pin positions are approximate (river or town level).

The gate register

Tap a column to sort

Obermeyer spillway gates supplied by Sam McCoy since 2006
YearSiteRegionHeight (m)Crest (m)Duty
2006Babagon Dam77 m + 31.5 m crestsSabah, Malaysia2.5108.5Water storage
2007Tamu DaratSabah, Malaysia112Upstream level management
2009Sungai KintaPerak, Malaysia230Beautification & recreation
2014Sungai LangatSelangor, Malaysia1.625Flood control & river regulation
2015Sungai TinggiSelangor, Malaysia2.848Upstream river level management
2017Tirtonadi, SoloCentral Java, Indonesia3.0860River beautification & flood control
2018Klong Yai Dam3-zone gateThailand1.0593Water storage improvement
2018SemarangCentral Java, Indonesia2.5152Upstream water level management
2019JambalangIndonesia340Spillway gate
2021Kali BlorongCentral Java, Indonesia2.5137.4Upstream water level management
2023SepakuEast Kalimantan, Indonesia1.5108Spillway gate
2024Sungai SelangorSelangor, Malaysia3.548Upstream water level management
—Bunus Flood Mitigation — BoyanKuala Lumpur, Malaysia4.55Flood mitigation (lake retention)
—Bunus — Ayer Panas & Sri Rampai3 gatesKuala Lumpur, Malaysia3.35Flood mitigation
—Sungai BilutPahang, Malaysia1.515Upstream water level management
—Sungai GapoiMalaysia1.510Upstream water level management
—Sungai SeringMalaysia1.28Upstream water level management

Source: Sam McCoy × Obermeyer Hydro briefing, October 2024. Undated rows are listed in that briefing without a year.

Next project

Have a river to hold, or a plant to upgrade?

Tell us the site, the flow and the problem. Our engineers will come back with an assessment and a way forward.